Phone: 952-562-8100 . . . . . . Email: office@advancedwaterproofing.net
Hire One Contractor! We provide complete project coordination and management through all phases
of the repair! - Custom-designed repairs providing guaranteed
results.
- Written specifications and scope of work.
- Removal and replacement of curb and gutter, pavement, patios --- whatever is necessary to complete the repair.
- Excavation and back-filling.
- Realistic project schedules
and progress reports.
- Complete site restoration to
original
improved condition! - Written warranties!
Recent Project: Oak Ridge Place Condominiums
- Hopkins, MN - Start Date: 8/30/11 - Completion Date: 10/31/11
|
| |
|
|
|
PROBLEM - Water leaking into the below-grade garage, which extends 60
feet beyond the building foundation wall, and is covered by a parking lot, patios, and gardens
|
Leaks in the middle of the ceiling, at the pre-stress plank joint,
caused water stains in the below-grade garage.
|
Water leaks caused staining on the interior wall surfaces of the below-grade
garage.
|
PROBLEMS UNCOVERED DURING EXCAVATION . . . .
|
|
Untreated plywood post support.
|
Drain tile covered with mud.
|
Improper flashing and waterproofing.
|
|
|
Removal of asphalt driveway, sidewalk, curb, plantings, fence,
and patios. Excavation down to the footings along the entire perimeter of the structure.
|
Simultaneous removal and replacement of waterproofing and
insulation materials.
|
Proper installation of waterproofing and flashing.
|
|
Two layers of waterproofing membrane and insulation on vertical
wall surfaces. Backfill with washed rock.
|
Surface (roof) is prepared for installation of waterproofing membrane.
|
Waterproofing membrane applied; surface prepared for root barrier
and insulation.
|
Root barrier applied; sidewall insulation completed.
|
Class 5 base, with curb and gutter, installed over waterproofing membrane
on the roof of the underground garage.
|
Ready for asphalt.
|
OTHER DETAILS NOT TO BE OVERLOOKED . . . .
|
|
BEFORE - Improper post support, and footing
placement extending 3 inches beyond the foundation wall, caused post to shift.
|
AFTER - Proper post support on new footing,
with waterproofing membrane applied.
|
|
BEFORE - Poor workmanship on installed block,
and no waterproofing applied.
|
AFTER - Block has been repaired and properly
waterproofed.
|
|
BEFORE - No flashing or waterproofing.
|
AFTER - Proper flashing and waterproofing has
been applied.
|
|
AND THE RESULT . . . . .
|
|
|
|
A beautifully manicured exterior, a parking garage that does
not leak, extremely happy customers, and of course, . . . . . a written warranty!
|

|
| Back to Home Page |
|
TIP: When you hire one contractor to
oversee the complete project, you have one person to call if questions or concerns arise.
|
|
|
|